The new build

no images were found

Foundation mounted on camper frame

Here we have the freshly removed floor system now notched into the camper frame.

Standing the side to the sleeper

Tricky to get this first wall standing but it doesn’t take long the build in some stiffness.

side

4

Took me two weeks to get this far but the first piece of metal roofing is resting in place so I can determine where to place framing.

Cutout for entrance

At first I wanted to phase out this original entrance but I decided that two doors might help if there were to be a fire.

DSCN0609

I was trying to gauge the wind resistance.  Total vertical clearance is right around twelve feet.

DSCN0614

DSCN0613

I call all this the sleeper.  Maybe a hanging locker for that first little space on the left and then I might do a sawdust toilet in the space to the right.

Sleeper

The bunk will be elevated and have compartments under it for off-season cloths.  Plenty of room for overhead cabinets.